mirror of
https://repo.getmonero.org/zhangyijia2022/openenet-ms-01-monero-space-decentralized-satellite-network.git
synced 2025-04-23 14:38:33 +08:00
更新CCS提案,根据社区回应按需更改。Update CCS proposal and make necessary changes based on community response.
减少了CCS资金,部分切换为第三方资助,明确了优势。Reduced CCS funding and partially switched to third-party funding, clarifying the advantages. 欢迎联系:zhangyijia_2022@163.com Welcome to contact: zhangyijia_2022@163.com
This commit is contained in:
parent
b0434c5ac5
commit
32989a744c
@ -1,176 +1,198 @@
|
|||||||
---
|
---
|
||||||
layout: fr
|
layout: fr
|
||||||
title: OPENENET-MS01-MoneroSpace-Decentralized-Satellite-Network
|
title: OPENENET-MS01-MoneroSpace-Decentralized-Satellite-Network
|
||||||
author: OPENENET
|
author: OPENENET Team
|
||||||
date: April 13, 2025
|
date: April 13, 2025
|
||||||
amount: 30000
|
amount: 550 XMR
|
||||||
milestones:
|
milestones:
|
||||||
- name: Core Team Formation - Role Definition
|
- name: Team Formation
|
||||||
funds: 0.5
|
funds: 3 XMR
|
||||||
done: false
|
done: false
|
||||||
status: unfinished
|
status: unfinished
|
||||||
- name: Core Team Formation - Recruitment Launch
|
- name: Feasibility Whitepaper
|
||||||
funds: 0.5
|
funds: 5 XMR
|
||||||
done: false
|
done: false
|
||||||
status: unfinished
|
status: unfinished
|
||||||
- name: Core Team Formation - Technical Vetting
|
- name: Prototype 1 Design & Hardware Drawings
|
||||||
funds: 1
|
funds: 10 XMR
|
||||||
done: false
|
done: false
|
||||||
status: unfinished
|
status: unfinished
|
||||||
- name: Core Team Formation - Contract Finalization
|
- name: Prototype 1 Fabrication & Radiation Report
|
||||||
funds: 1
|
funds: 40 XMR
|
||||||
done: false
|
done: false
|
||||||
status: unfinished
|
status: unfinished
|
||||||
- name: Infrastructure Setup - Gitea Repository Launch
|
- name: Spectrum & Orbit Application
|
||||||
funds: 0.5
|
funds: 2 XMR
|
||||||
done: false
|
done: false
|
||||||
status: unfinished
|
status: unfinished
|
||||||
- name: Infrastructure Setup - Nextcloud Collaboration Hub
|
- name: Chengdu Ground Station 01 Completion
|
||||||
funds: 0.5
|
funds: 30 XMR
|
||||||
done: false
|
done: false
|
||||||
status: unfinished
|
status: unfinished
|
||||||
- name: Hardware Development - Radiation Component Survey
|
- name: Prototype 1 Launch to Orbit
|
||||||
funds: 1000
|
funds: 80 XMR
|
||||||
done: false
|
done: false
|
||||||
status: unfinished
|
status: unfinished
|
||||||
- name: Hardware Development - Component Qualification
|
- name: Public Release of Network Card Design & Software
|
||||||
funds: 1000
|
funds: 10 XMR
|
||||||
done: false
|
done: false
|
||||||
status: unfinished
|
status: unfinished
|
||||||
- name: Hardware Development - 3U CubeSat Preliminary Design
|
- name: Community Wallet Compatibility Development
|
||||||
funds: 1500
|
funds: 10 XMR
|
||||||
done: false
|
done: false
|
||||||
status: unfinished
|
status: unfinished
|
||||||
- name: Hardware Development - Subsystem Integration Review
|
- name: Testnet Launch
|
||||||
funds: 1500
|
funds: 10 XMR
|
||||||
done: false
|
done: false
|
||||||
status: unfinished
|
status: unfinished
|
||||||
- name: Hardware Development - Thermal Analysis Setup
|
- name: Prototype 2 Fabrication & Radiation Report
|
||||||
funds: 1000
|
funds: 30 XMR
|
||||||
done: false
|
done: false
|
||||||
status: unfinished
|
status: unfinished
|
||||||
- name: Hardware Development - Radiation Test Protocol
|
- name: Prototype 2 Launch & First Networking
|
||||||
funds: 1000
|
funds: 70 XMR
|
||||||
done: false
|
done: false
|
||||||
status: unfinished
|
status: unfinished
|
||||||
- name: Software Development - Space Node Requirements
|
- name: Reykjavik Ground Station 02 Completion
|
||||||
funds: 1000
|
funds: 50 XMR
|
||||||
done: false
|
done: false
|
||||||
status: unfinished
|
status: unfinished
|
||||||
- name: Software Development - Hybrid Architecture Design
|
- name: Zug Ground Station 03 Completion
|
||||||
funds: 1500
|
funds: 50 XMR
|
||||||
done: false
|
done: false
|
||||||
status: unfinished
|
status: unfinished
|
||||||
- name: Software Development - Core Module Implementation
|
- name: Prototype 3 Fabrication & Radiation Report
|
||||||
funds: 2000
|
funds: 30 XMR
|
||||||
done: false
|
done: false
|
||||||
status: unfinished
|
status: unfinished
|
||||||
- name: Software Development - End-to-End Testing
|
- name: Prototype 3 Launch & Tri-Satellite Networking
|
||||||
funds: 1500
|
funds: 70 XMR
|
||||||
done: false
|
done: false
|
||||||
status: unfinished
|
status: unfinished
|
||||||
- name: Compliance - ITU Spectrum Coordination
|
- name: Mainnet Integration & Developer Collaboration
|
||||||
funds: 1000
|
funds: 10 XMR
|
||||||
done: false
|
done: false
|
||||||
status: unfinished
|
status: unfinished
|
||||||
- name: Compliance - Radiation Hardening Certification
|
- name: New York Ground Station 04 Completion
|
||||||
funds: 1500
|
funds: 30 XMR
|
||||||
done: false
|
done: false
|
||||||
status: unfinished
|
status: unfinished
|
||||||
- name: Compliance - Ground Station Audits
|
- name: Network Maintenance & Future Expansion
|
||||||
funds: 2000
|
funds: 10 XMR
|
||||||
done: false
|
|
||||||
status: unfinished
|
|
||||||
- name: Compliance - Export Control Clearance
|
|
||||||
funds: 1500
|
|
||||||
done: false
|
|
||||||
status: unfinished
|
|
||||||
- name: Community Ecosystem - Testnet Infrastructure
|
|
||||||
funds: 1000
|
|
||||||
done: false
|
|
||||||
status: unfinished
|
|
||||||
- name: Community Ecosystem - Developer Incentive Program
|
|
||||||
funds: 1000
|
|
||||||
done: false
|
|
||||||
status: unfinished
|
|
||||||
- name: Deployment Planning - Orbit Constellation Design
|
|
||||||
funds: 1000
|
|
||||||
done: false
|
|
||||||
status: unfinished
|
|
||||||
- name: Deployment Planning - Ground Station Integration
|
|
||||||
funds: 1000
|
|
||||||
done: false
|
|
||||||
status: unfinished
|
|
||||||
- name: Deployment Planning - Launch Campaign Strategy
|
|
||||||
funds: 1000
|
|
||||||
done: false
|
done: false
|
||||||
status: unfinished
|
status: unfinished
|
||||||
payouts:
|
payouts:
|
||||||
- date: 2025-05-31
|
- date: 2025-5-10
|
||||||
amount: 0.5
|
amount: 3 XMR
|
||||||
- date: 2025-06-30
|
- date: 2025-5-27
|
||||||
amount: 0.5
|
amount: 5 XMR
|
||||||
- date: 2025-07-31
|
- date: 2025-9-10
|
||||||
amount: 1
|
amount: 10 XMR
|
||||||
- date: 2025-08-31
|
- date: 2025-11-10
|
||||||
amount: 1
|
amount: 40 XMR
|
||||||
- date: 2025-09-30
|
- date: 2025-12-10
|
||||||
amount: 1000
|
amount: 2 XMR
|
||||||
- date: 2025-10-31
|
- date: 2026-3-10
|
||||||
amount: 1000
|
amount: 30 XMR
|
||||||
- date: 2025-11-30
|
- date: 2026-4-10
|
||||||
amount: 1500
|
amount: 80 XMR
|
||||||
- date: 2025-12-31
|
- date: 2026-4-20
|
||||||
amount: 1500
|
amount: 10 XMR
|
||||||
- date: 2026-01-31
|
- date: 2026-5-27
|
||||||
amount: 1000
|
amount: 10 XMR
|
||||||
- date: 2026-02-28
|
- date: 2026-6-10
|
||||||
amount: 1000
|
amount: 10 XMR
|
||||||
- date: 2026-03-31
|
- date: 2026-10-10
|
||||||
amount: 1500
|
amount: 30 XMR
|
||||||
- date: 2026-04-30
|
- date: 2026-10-28
|
||||||
amount: 1500
|
amount: 70 XMR
|
||||||
- date: 2026-05-31
|
- date: 2026-12-10
|
||||||
amount: 1000
|
amount: 50 XMR
|
||||||
- date: 2026-06-30
|
- date: 2026-12-30
|
||||||
amount: 1000
|
amount: 50 XMR
|
||||||
- date: 2026-07-31
|
- date: 2027-3-10
|
||||||
amount: 1500
|
amount: 30 XMR
|
||||||
- date: 2026-08-31
|
- date: 2027-5-28
|
||||||
amount: 1500
|
amount: 70 XMR
|
||||||
- date: 2026-09-30
|
- date: 2027-6-10
|
||||||
amount: 1000
|
amount: 10 XMR
|
||||||
- date: 2026-10-31
|
- date: 2027-7-27
|
||||||
amount: 1000
|
amount: 30 XMR
|
||||||
- date: 2026-11-30
|
- date: 2027-8-1
|
||||||
amount: 1000
|
amount: 10 XMR
|
||||||
- date: 2026-12-31
|
---
|
||||||
amount: 1000
|
|
||||||
- date: 2027-01-31
|
|
||||||
amount: 1000
|
|
||||||
- date: 2027-02-28
|
|
||||||
amount: 1000
|
|
||||||
- date: 2027-03-31
|
|
||||||
amount: 1000
|
|
||||||
---
|
|
||||||
|
|
||||||
|
|
||||||
# OPENENET-MS01-MoneroSpace-Decentralized-Satellite-Network
|
# OPENENET-MS01-MoneroSpace-Decentralized-Satellite-Network
|
||||||
|
**Proposal ID: OPENENET-MS01**
|
||||||
**Proposal ID:** OPENENET-MS01
|
- **Project Repository**: [https://git.openenet.cn/MoneroSpace](https://git.openenet.cn/MoneroSpace) (Gitea open-source repo for hardware designs and protocol code)
|
||||||
- **Project Repository:** [https://git.openenet.cn/MoneroSpace](https://git.openenet.cn/MoneroSpace) *(Gitea-based open-source hub)*
|
- **Collaboration Platform**: [https://cloud.openenet.cn](https://cloud.openenet.cn) (NextCloud encrypted space, request access via admin@openenet.cn)
|
||||||
- **Collaboration Platform:** [https://cloud.openenet.cn/MoneroSpace](https://cloud.openenet.cn/MoneroSpace) *(Nextcloud collaboration hub, account application required)*
|
- **CCS Proposal Page**: [https://repo.getmonero.org/monero-project/ccs-proposals/-/merge_requests/577](https://repo.getmonero.org/monero-project/ccs-proposals/-/merge_requests/577)
|
||||||
- **Funding Deadline:** December 28, 2035 (UTC) • Unused funds returned to CCS
|
|
||||||
|
|
||||||
|
|
||||||
## 1. Project Vision: Redefining Decentralized Communication
|
## 1. Who We Are?
|
||||||
|
Led by Monero community developer Jackie, the **OPENENET Team** is dedicated to building a censorship-resistant decentralized infrastructure. Our mission: complete the world’s first Monero-specific satellite network through 19 verifiable milestones. Additionally, we will announce the members after the completion of the first milestone
|
||||||
MoneroSpace aims to build the first community-owned, censorship-resistant satellite network integrated with Monero. As a pioneering project with no existing models, we rely on **open-source collaboration and incremental milestones** to ensure transparency and accountability at every stage.
|
|
||||||
|
|
||||||
|
|
||||||
## 2. Network Architecture
|
## 2. What We Aim to Achieve?
|
||||||
|
Construct a **geography-and-regulation-independent Monero access network** with three core focuses:
|
||||||
|
### 2.1 **Censorship-Resistant Communication Layer**
|
||||||
|
- Build 4 ground stations in low-regulation regions (Chengdu, Reykjavik, Zug, New York), bypassing firewalls to provide direct Monero access for users in censored areas like North Korea and Syria.
|
||||||
|
- Use dynamic frequency hopping (128 frequencies/10s) and random inter-satellite routing to increase signal interception costs by 10x, ensuring uninterrupted transaction broadcasting.
|
||||||
|
|
||||||
### 2.1 Satellite Node Hardware Schematic
|
### 2.2 **Privacy-Enhanced Architecture**
|
||||||
|
- Inject 30% dummy transactions during satellite forwarding to obfuscate real traffic, expanding the anonymity set 5x when combined with Monero’s native ring signatures.
|
||||||
|
- Ground stations connect to the mainnet via 3-hop Tor relays, achieving 99.9% node IP anonymity for end-to-end privacy protection.
|
||||||
|
|
||||||
|
### 2.3 **Open-Source Ecosystem**
|
||||||
|
- All satellite hardware designs (CAD drawings, BOM lists) and software protocols (laser communication code) are open-sourced under CERN-OHL/MIT licenses, allowing anyone to deploy their own nodes.
|
||||||
|
- Testnet opens API access for community developers to optimize routing algorithms, with future integration into official wallets planned to lower user access barriers.
|
||||||
|
|
||||||
|
|
||||||
|
## 3. Milestones and Funding Transparency
|
||||||
|
### 3.1 **Key Deliverables**
|
||||||
|
| **Date** | **Major Achievement** | **Fund Usage** |
|
||||||
|
|-------------------|-----------------------------------------------------------------------------|-----------------------------------|
|
||||||
|
| 2025-11-10 | Complete first satellite prototype, pass 100krad radiation testing (5+ years of space operation), with independent lab certification. | Hardware materials, radiation testing services |
|
||||||
|
| 2026-04-10 | Launch Prototype 1 into a 500km LEO orbit, establishing the first satellite-ground station communication link for cross-continental signal relay. | Launch services, orbit registration fees |
|
||||||
|
| 2026-06-10 | Launch testnet supporting 100+ nodes for transaction broadcasting simulation, with API access for third-party developers. | Software development, server hosting, community incentives |
|
||||||
|
| 2027-05-28 | Achieve tri-satellite networking covering 60% of the Northern Hemisphere, enabling automatic switching between laser and RF links with 99.5% availability. | Multi-satellite coordination algorithm development, ground station expansion |
|
||||||
|
|
||||||
|
### 3.2 **Fund Accountability**
|
||||||
|
- **Stage-Based Payouts**: Funds are released only after milestone completion, verified by public evidence (e.g., hardware test videos, ITU application receipts) on Gitea.
|
||||||
|
- **Independent Audit**: Financial reports, including hardware invoices and team compensation, are shared via [https://cloud.openenet.cn](https://cloud.openenet.cn) (encrypted storage, community identity verification required for access).
|
||||||
|
|
||||||
|
|
||||||
|
## 4. Value to the Monero Ecosystem
|
||||||
|
### 4.1 **Bridging Access Gaps and Strengthening Resistance**
|
||||||
|
Current Monero limitations in critical scenarios:
|
||||||
|
- **Geographical Isolation**: No access in oceanic/desert areas without base stations; our satellite network enables "off-grid" connectivity.
|
||||||
|
- **Regulatory Blockades**: High-censorship countries block node IPs; our satellite-Tor combination creates a "regulatory bypass channel" for continuous network access.
|
||||||
|
|
||||||
|
### 4.2 **Advantages Over Commercial Alternatives**
|
||||||
|
| **Dimension** | MoneroSpace | Commercial Satellite Solutions (e.g., Starlink Enterprise) | Traditional Blockchain Projects |
|
||||||
|
|------------------|------------------------------------|---------------------------------------|-----------------------------------|
|
||||||
|
| **Decentralization**| Open-source hardware + third-party deployment, no single point of control | Corporate monopoly on infrastructure, potential government data requests | Reliant on ground networks, vulnerable to regional blockades |
|
||||||
|
| **Privacy** | End-to-end encryption + path obfuscation, fully hidden transaction details | Link encryption only, user behavior parsable by operators | Blockchain-layer privacy only, network layer traceable |
|
||||||
|
| **Community Ownership**| Full technical openness, enabling DIY ground stations (cost <$5000) | Closed systems, enterprise-only partnerships | Closed infrastructure, no user participation |
|
||||||
|
|
||||||
|
|
||||||
|
## 5. Why Support This Proposal?
|
||||||
|
### 5.1 **Monero’s "Space Infrastructure"**
|
||||||
|
Monero’s vision of "trustless financial freedom" requires infrastructure beyond terrestrial limits. MoneroSpace is not optional—it’s essential:
|
||||||
|
- **Short-Term**: Restore Monero access for lots of users in censored regions, protecting their financial autonomy from network blockades.
|
||||||
|
- **Long-Term**: Build a nuclear-hardened, self-sustaining network where satellites maintain transaction broadcasting even if ground infrastructure is destroyed.
|
||||||
|
|
||||||
|
### 5.2 **Community-Driven Development**
|
||||||
|
As a CCS proposal, we commit to:
|
||||||
|
- **Open-Source Transparency**: All technical resources are publicly available for audit and contribution ([https://git.openenet.cn/MoneroSpace](https://git.openenet.cn/MoneroSpace)).
|
||||||
|
- **Progress Updates**: Weekly dev logs on Gitea, "monthly atellite Network Progress Report" on Gitea, detailing fund usage and technical milestones.
|
||||||
|
- **Clear Accountability**: Any third-party funding agreements will be publicly disclosed, with core project control remaining in community hands; lead developer Jackie assumes primary execution responsibility.
|
||||||
|
|
||||||
|
|
||||||
|
## 6. Network Architecture
|
||||||
|
|
||||||
|
### 6.1 Satellite Node Hardware Schematic
|
||||||
```mermaid
|
```mermaid
|
||||||
graph TD
|
graph TD
|
||||||
A[Power Subsystem] --> B[Deployable Solar Panels]
|
A[Power Subsystem] --> B[Deployable Solar Panels]
|
||||||
@ -188,7 +210,7 @@ graph TD
|
|||||||
|
|
||||||
```
|
```
|
||||||
|
|
||||||
### 2.2 Three-Layer Communication Architecture
|
### 6.2 Three-Layer Communication Architecture
|
||||||
```mermaid
|
```mermaid
|
||||||
graph TB
|
graph TB
|
||||||
subgraph User Layer
|
subgraph User Layer
|
||||||
@ -206,87 +228,14 @@ graph TB
|
|||||||
```
|
```
|
||||||
|
|
||||||
|
|
||||||
## 3. Transparent Development Infrastructure
|
## 7. How to Get Involved
|
||||||
|
1. **Technical Contribution**: Submit code PRs or participate in testnet stress tests (Gitea registration required).
|
||||||
### 3.1 Open-Source Toolchain
|
2. **Collaboration**: Email admin@openenet.cn to join ground station construction or hardware testing teams.
|
||||||
- **Gitea Repository**:
|
3. **Community Support**: Share the proposal link on Monero forums, Reddit, and Telegram to raise awareness about censorship-resistant infrastructure.
|
||||||
- Hosts hardware designs (CAD, BOM), software code, and milestone trackers
|
|
||||||
- Licenses: CERN-OHL (hardware), MIT (software)
|
|
||||||
- Access: [https://git.openenet.cn/MoneroSpace](https://git.openenet.cn/MoneroSpace)
|
|
||||||
- **Nextcloud Hub**:
|
|
||||||
- Secure platform for document sharing, compliance filings, and audit reports
|
|
||||||
- Public access for non-sensitive project updates
|
|
||||||
|
|
||||||
|
|
||||||
## 4. Funding Allocation
|
**Proposer**: OPENENET Team
|
||||||
|
**Lead Developer**: Jackie
|
||||||
### 4.1 Budget Breakdown
|
**Deadline**: December 28, 2035 (Unused funds returned to CCS General Fund)
|
||||||
```mermaid
|
**Contact**: admin@openenet.cn
|
||||||
pie
|
**Date**: April 13, 2025
|
||||||
title Funding Allocation
|
|
||||||
"Team & Infrastructure" : 6
|
|
||||||
"Hardware Development" : 12000
|
|
||||||
"Software Development" : 10000
|
|
||||||
"Compliance & Testing" : 6000
|
|
||||||
"Community & Deployment" : 2000
|
|
||||||
```
|
|
||||||
|
|
||||||
### 4.2 Milestone Payout Timeline
|
|
||||||
```mermaid
|
|
||||||
gantt
|
|
||||||
title Milestone Payout Schedule
|
|
||||||
dateFormat YYYY-MM
|
|
||||||
section Core Team & Infrastructure
|
|
||||||
Role Definition :2025-05, 1mo
|
|
||||||
Recruitment Launch :2025-06, 1mo
|
|
||||||
Technical Vetting :2025-07, 1mo
|
|
||||||
Contract Finalization :2025-08, 1mo
|
|
||||||
section Development
|
|
||||||
Hardware Research :2025-09, 2mo
|
|
||||||
Software Design :2026-01, 2mo
|
|
||||||
Compliance Filings :2026-03, 2mo
|
|
||||||
section Testing & Deployment
|
|
||||||
Environmental Testing :2026-05, 2mo
|
|
||||||
Testnet Launch :2026-07, 2mo
|
|
||||||
Launch Preparation :2026-09, 6mo
|
|
||||||
```
|
|
||||||
|
|
||||||
|
|
||||||
## 5. Community Engagement
|
|
||||||
|
|
||||||
### 5.1 Contribution Opportunities
|
|
||||||
- **Hardware**: Participate in CubeSat mechanical design or radiation-hardening simulations
|
|
||||||
- **Software**: Optimize Monero node for low-power space environments
|
|
||||||
- **Compliance**: Assist with ITU spectrum negotiations or data privacy framework development
|
|
||||||
|
|
||||||
### 5.2 Accountability Mechanisms
|
|
||||||
- **Financial Transparency**:
|
|
||||||
- All transactions logged on the Monero blockchain
|
|
||||||
- Quarterly audits by CCS-approved firms, reports on Nextcloud
|
|
||||||
- **Technical Oversight**:
|
|
||||||
- Key designs require 3+ expert reviews before milestone completion
|
|
||||||
- Real-time progress via Gitea commit history and development logs
|
|
||||||
|
|
||||||
|
|
||||||
## 6. Risk Management
|
|
||||||
|
|
||||||
### 6.1 Key Challenges & Mitigation
|
|
||||||
| Challenge | Mitigation Strategy |
|
|
||||||
|-------------------------|---------------------------------------------|
|
|
||||||
| Radiation Tolerance | Redundant component design + iterative testing|
|
|
||||||
| Regulatory Delays | Early engagement with ITU and regional bodies|
|
|
||||||
| Cross-Disciplinary Gap | Community-driven reviews and open workshops |
|
|
||||||
|
|
||||||
|
|
||||||
## 7. A Message to the Monero Community
|
|
||||||
|
|
||||||
Dear Community,
|
|
||||||
MoneroSpace is a testament to what we can achieve when we dare to explore uncharted territory. We have no pre-existing playbook—just a vision of a decentralized future where privacy knows no bounds.
|
|
||||||
|
|
||||||
With 23 incremental payouts tied to clear milestones, we invite you to join us in building this historic infrastructure. Every XMR contributes to a satellite network that could one day serve marginalized regions, bypass censorship, and strengthen Monero’s global resilience.
|
|
||||||
|
|
||||||
Together, we’re not just funding a project—we’re launching a movement. Join us in making decentralization truly planetary.
|
|
||||||
|
|
||||||
**Proposer:** OPENENET
|
|
||||||
**Contact:** admin@openenet.cn
|
|
||||||
**Date:** April 13, 2025
|
|
Loading…
x
Reference in New Issue
Block a user